Here is our music video:


Below are the outside panels to our digipak.

Below are the outside panels to our digipak.

Below are the inside panels to our digipak.

Below are the inside panels to our digipak.

Click on the image below to access our website.

Tuesday 7 March 2017

Construction Post 5: The Back-Up Shoot

Our back-up shoot went much better than our main shoot, despite initially undesirable weather. When we began filming it was raining, so we quickly decided to film the kitchen shots first. These were shot far more successfully, with several changes made to the shots we originally had in the main shoot (For example the shot of the lawyer's reaction to the forms she was signing and that she now received a text message.).

When the rain had passed we filmed the outdoor shots, which were much better than the main shoot equivalents, as we had decided to re-shoot one of the takes we had had for the shot we had trouble with in the main shoot, but with much steadier camerawork (This shot being the jogger's POV, rushing towards the lawyer.). We re-shot every outdoor shot to make it easier to edit, and overall we certainly achieved what we had planned to do for this shoot - improve on the weaknesses of our main shoot.

No comments:

Post a Comment